Projects that are still at an early stage must demonstrate a clear purpose and structured preparation. Projects that are further advanced must demonstrate realistic plans, the current status, and how continued development and operations will be organised.
Application for H2: What Must Be Provided
Short description of the problem
Why the project matters
What the analysis is expected to deliver
What external work is planned
Application for H3: What Must Be Provided
Outcome of H2 and selected approach
Realistic plan for the next step
Matching contribution and institutional responsibility
Cost overview distinguishing internal and external costs
H1 – Initial Assessment and Scoping
Requirements for | Documents / Material |
Clear project scoping | Brief needs assessment |
Description of the problem | Description of the system and its role |
Understanding of services, processes, and data | Overview of key services and data |
Assessment of the system’s importance | Brief assessment of impact on operations and users |
H2 – Independent Technical Analysis and Modernisation Path
Requirements for | Documents / Material |
Assessment of options | Initial analysis of approaches and options |
Clear position on procurement, adaptation, or development | Summary of the selected approach |
Assessment of integrations with other systems and infrastructure | Functional and technical specifications, where applicable |
Assessment of data, security, and privacy requirements | Summary of key requirements and assumptions |
H3 – Solution Setup or Development and Integration
Plans for | Documents / Material |
Project implementation | Functional and technical specifications |
Integrations and phased delivery | Integration description and implementation plan |
Responsibilities between parties | Contractual basis or procurement documents, where applicable |
Ownership of data and documentation | Clear statement of responsibilities or contractual assumptions |
H4 – Operational Environment Setup
Plans for | Documents / Material |
Hosting and operational environment | Description of the operational environment |
Operational responsibility and services | Operating model and responsibility arrangements |
Security, monitoring, and recovery | Description of security and operational measures |
Access management and operational documentation | Operational documentation and integration overview |
H5 – Operations and Maintenance
Plans for | Documents / Material |
Continued operations and maintenance | Operations and maintenance plan |
Service levels and change management | Description of service levels and updates |
Decommissioning of the legacy solution | Plan for phasing out the legacy system |
Exit strategy and continued development | Plan for exit strategy and future development |
Separation of Internal and External Costs
Applications must include a simple cost overview in which work packages are itemised and a distinction is made between internal and external costs. It must be clear what work is carried out internally by the institution and what is procured externally.
Funding from FJR applies only to externally procured work, not to internal work already performed by salaried employees of the institution.